evang. Schulwerk Gymnasium Andreanum / Hildesheim 2014 http://www.andreanum.de/

Size of wall 8m x 2.8m

Fall protection provided by the school

Construction of a bouldering wall in complicated structural conditions as there is a concrete element mounted on 4 bolts between the concrete columns.

The bouldering wall was installed such that the load transfer occurs at the base and the concrete columns and not at the faced masonry.

 

Weitere Projekte und Referenzen in "Bouldering walls and climbing walls":